All Exclusive Homes Logo
Kensington Park
Unley Park 1
Carrickalinga

Step 3

Preliminary Services Agreement

This outlines the stages of this phase and both our responsibilities. We will work closely with you through these stages to ensure the process is as easy and rewarding as possible. By working together through these stages we are preparing the ground to embark on to the successful and smooth completion of the next phase – construction.

In overview this process is where you take your current “brainstorm” design through to working drawings and ultimately contract signing and hence are ready for construction to begin. There are a number of inter related steps to achieve this, in overview these are (milestones in bold):

Stage

Our Role

 

Your Role

 

  • Final Full Measure
  • Visit site and confirm/gather all required measurements and discuss any final design changes
 
  • Working drawing development
  • Incorporate design changes and develop documentation to provide working drawings
  • Feedback on drawings and electrical layout plan
  • Sign off working drawings
  • Once you have signed off on working drawings we will lodge with Council for Planning Approval
  • Consider the working drawings and when comfortable with them sign them off to indicate no more changes to design
  • Lodgment for Planning approval
  • Lodge drawings to Council, monitoring of process
  • Input into any changes required by Council
  • Engineering and surveying (if required)
  • Organise engineering and site survey (if required)
  • Organise site access for soil sampling and surveyors – if necessary
  • Selections
  • Our Interior Designer, will contact you. She will guide you through selections of tiles, appliances, sanitary ware, kitchen, joinery and finishes etc. Our designer will also assist you with achieving your styling requirements including the preparation of interior and paint colour schemes and collate selections for your building schedule.
  • Meet and liaise with our designer for assistance and queries. Meet our recommended suppliers and make your selections.
  • Kitchen/Cabinet design
  • Our Kitchen Designer, will help you through the design of your Kitchen/cabinet design
  • Meet with our designer and work together to design the cabinets
  • Sign off selections
  • Collate all selections (refer Items 6 & 7 above)
  • Consider the selections, electrical layout and cabinet designs and when comfortable with them sign them off to indicate no more changes
  • Prepare and lodge for Building Approval
  • Obtain necessary engineering & timber framing layouts and lodge to Private Certifier to obtain Building Approval
  • Nil
  • Finalise Schedule
  • The Selection process will clarify much of the Building Schedule. We will meet with you to finalise all schedule issues
  • Input into schedule and “sign off” on schedule
  • Pricing
  • Once we have signed off working drawings, planning approval and final signed off selections we do a final costing the project.
  • Nil
  • Development Approval
  • Obtain final approval from Council, being Development Approval (the third step after Planning and Building Approval) from the Council
  • Nil. Note this process may take 3 to 4 weeks and is required before construction commences.
  • Contract meeting
  • We will meet you to go through all aspects of the contract. A “fixed” price will be determined before contract signing
 
  • Contract signing
  • Documents prepared ready for signing
  • Sign contracts
  • Finance Approval
 
  • Provide finance approval
  • Start Construction phase
   

 

 

 

 

 

 

 

 

 

 


.
.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 



 

 
 
Got to TOP
All Exclusive Homes © 2006   |  Site Map  |  Disclaimer  |  Privacy  |  Credits